Watch the improvements being made to the exterior of Maylands House and how it can impact your Commercial unit.
Follow the progress of Maylands House!
Rear Works
Start Expected to end
Status: in progress
The rear of Maylands is undergoing a renovation, with scaffolding going up to access high-level areas and chimneys. Key tasks include replacing the roof, restoring brick and stonework, installing new windows, and ensuring the building is safe with lightning protection. Additionally, decorative features like window cills, rainwater goods, and soil pipes will be added, along with pest control measures and final inspections, all culminating in a sleek and secure rear elevation.
This milestone includes
Raise Scaffold at the Rear
Start January 2025Expected to end April 2025
We will start by building a safe platform at the back of the building to reach the highest points and ensure every corner gets the attention it needs.
Install Hoist
Start April 2025Expected to end May 2025
A hoist is installed, making it easier to lift heavy materials up and down, speeding up the work and ensuring a smooth flow of progress.
Asbestos Survey on Fabric
Start April 2025Expected to end April 2025
Before any changes, we check for asbestos, safely inspecting the fabric to ensure everything is clear and ready for the works to continue.
Windows Survey, Drawings & Order
Start May 2025Expected to end May 2025
Our team takes a careful look at the rear-facing windows, planning repairs and replacements to ensure they are functional and beautiful once again.
Clean of Exterior Walls
Start May 2025Expected to end June 2025
Using a low-pressure steam cleaning method to clean the building’s exterior.
Windows Manufacturing
Start May 2025Expected to end September 2025
Custom windows are crafted specifically for the rear elevation, perfectly fitting into the space to enhance the look and feel of the building.
Inspect and Brick Repairs
Start June 2025Expected to end June 2025
Each brick and stone is examined for wear and tear, with a strategy created to repair and re-point wherever necessary, preserving the building's history.
Stone Repairs
Start June 2025Expected to end July 2025
Stones are gently cleaned, returning the rear facade to its former glory.
Waterproofing to Stonework
Start August 2025Expected to end September 2025
Special waterproofing is applied to the building's feature stonework, protecting it from the elements and ensuring it lasts for years to come.
Install Rear Windows
Start Expected to end
New windows are carefully fitted into the rear elevation, bringing light and a polished look to the space.
Final Check of Exterior Fabric
Start Expected to end
Once the heavy lifting is done, a thorough inspection is carried out to ensure the main exterior work is completed to the highest standards.
Pest Control
Start Expected to end
We ensure the building is free from pests with a professional treatment, keeping everything clean and safe for all.
Install Rainwater Decs
Start Expected to end
Installing rainwater systems, ensuring both function and style as water flows down the building’s facade.
Install Soil Pipes
Start Expected to end
Installing soil pipes, enhancing the overall look of the rear of the building.
Organise and Manage Cables
Start Expected to end
Cables are carefully managed and organised, ensuring a clutter-free and visually appealing space.
Install Window Cills and Seals
Start Expected to end
New window cills and pressings are installed, and mastic sealing ensures everything is watertight, keeping the building secure.
Strike Rear Scaffold
Start Expected to end
With all the work done, the scaffolding at the rear comes down, and the building stands proudly in its fully restored state.
Clarion Housing Association Limited is registered with Regulator of Social Housing (4865); and is a Charitable Community Benefit Society under the Co-operative and Community Benefit Societies Act 2014 (7686) and affiliated to The National Housing Federation, and G15 (London’s 15 largest housing associations). VAT no 675646394. Clarion Housing Association Limited’s registered office is at Level 5, Greater London House, Hampstead Road, London NW1 7QX.
Clarion Housing Association Limited is authorised and regulated by the Financial Conduct Authority (FRN 792463)
Cookie Control
We use necessary cookies to make our site work. We would also like to use optional cookies to improve our online services, give you the best website experience possible and deliver tailored content, on and off our site. We will not set any optional cookies unless you enable them.
Necessary Cookies
Some cookies are needed for the website to work – for instance when the site requires login access, we use cookies so that you aren’t required to enter them again as you move throughout the website. You can’t switch these cookies off.
Analytics Cookies
We use these cookies to track and analyse how you use our website. For example, which pages you visit, or whether you view content or download documents. We use this information to improve our online services and give you the best website experience possible through more relevant and personalised content. You can switch these cookies on or off at any time. Third-party analytics are set by Google Analytics. For more information visit Google Analytics privacy policy.
We use cookies - to ensure that we give you the best experience on our website. By accepting we'll assume that you are happy to receive all cookies on our website. However, if you would like to, you can change your cookies settings at any time.
Manage Cookies